When setting up a negative dependency (do not run at the same time as) in CA7 is it necessary to list the negative dependency as a successor job and as a requirement?
--------------------------- SUCCESSOR JOBS --
JOB=/GF23FT00 SCHID=000
---------------- REQUIREMENTS AND NETWORK CONNECTIONS -----
JOB=/GF23FT00 SCHID=001 VRSN=19038/0903 |
|