hi all,
i have written a new jcl,
this job should be run everyday ..... currently it is not scheduled in ca-7
how do i do it |
|
Back to top |
|
|
expat
Global Moderator
Joined: 14 Mar 2007 Posts: 8796 Location: Welsh Wales
|
|
|
|
Ask the people responsible for the maintenence of CA7 to schedule the job to your requirements. |
|
Back to top |
|
|
rakesha.hg
Active User
Joined: 21 Mar 2008 Posts: 161 Location: bangalore
|
|
|
|
thanks expat!
sysadmin people scheduled it. |
|
Back to top |
|
|
seetham
New User
Joined: 26 Mar 2008 Posts: 2 Location: india
|
|
|
|
you need to contact the schedular, he will define the job and schedule to run every day or you wanted to schedule by your self if you have access to ca7
1.define the job
2. go to db.2.1 fill the appriate |
|
Back to top |
|
|
rakesha.hg
Active User
Joined: 21 Mar 2008 Posts: 161 Location: bangalore
|
|
|
|
hi seetham,
thanks
seetham wrote: |
you need to contact the schedular, he will define the job and schedule to run every day or you wanted to schedule by your self if you have access to ca7
1.define the job
2. go to db.2.1 fill the appriate |
can you explain/elaborate the second point |
|
Back to top |
|
|
dick scherrer
Moderator Emeritus
Joined: 23 Nov 2006 Posts: 19243 Location: Inside the Matrix
|
|
|
|
Hello,
Quote: |
2. go to db.2.1 fill the appriate
Quote: |
can you explain/elaborate the second point |
|
db.2.1 is site specific and will not work for all systems. |
|
Back to top |
|
|
rakesha.hg
Active User
Joined: 21 Mar 2008 Posts: 161 Location: bangalore
|
|
|
|
thank you guys,
i dont have that facility
whats the alternative ? |
|
Back to top |
|
|
dick scherrer
Moderator Emeritus
Joined: 23 Nov 2006 Posts: 19243 Location: Inside the Matrix
|
|
|
|
Hello,
Quote: |
whats the alternative ? |
Work with the scheduling people as you did to get this job scheduled. Usually there is more to production turnover than merely making an entry in the schedule. |
|
Back to top |
|
|
Anuj Dhawan
Superior Member
Joined: 22 Apr 2006 Posts: 6248 Location: Mumbai, India
|
|
|
|
Hi,
Joining the party pretty late..
Well, if a new JOB needs to added you need to update the 'regular' sechduler at your shop. Check what code is used for DAILY job, on the same line you've to work.
Lately I've updated a scheduler for a new job at my shop, I was supposed to add that JOB in the sceduler the way I want & then there were follow up with sceduling people.
Hope this helps.. |
|
Back to top |
|
|
rakesha.hg
Active User
Joined: 21 Mar 2008 Posts: 161 Location: bangalore
|
|
|
|
Anuj D. wrote: |
Lately I've updated a scheduler for a new job at my shop, I was supposed to add that JOB in the sceduler the way I want & then there were follow up with sceduling people.
Hope this helps.. |
hi all,
I did the same thing, i gave the requirements and conditions under which
my job runs to the sysadmin people, they followed it up!
its scheduled and working
thanks all you guys for ur time |
|
Back to top |
|
|
Anuj Dhawan
Superior Member
Joined: 22 Apr 2006 Posts: 6248 Location: Mumbai, India
|
|
|
|
Hi,
Quote: |
its scheduled and working |
Good.. .
Some times we (I) realize that everything is not to be done by us (Application Engineers..). Very few times we got the opportunity
to instruct some one.. |
|
Back to top |
|
|
rakesha.hg
Active User
Joined: 21 Mar 2008 Posts: 161 Location: bangalore
|
|
|
|
hi,
Yes i do agree with you,
sometimes its better we instruct someone(leave it to profeesionals) to do their work! |
|