View previous topic :: View next topic
|
Author |
Message |
ricaportela
New User
Joined: 23 Apr 2005 Posts: 2 Location: Brazil
|
|
|
|
Hi Everyone !!!
I need make a schedule dynamic in Control-M generating a JCL with a COBOl program. I already make the cobol program to generate a JCL, now i need schedule this or these JCLs in Control-M.
Best regards!!! |
|
Back to top |
|
|
Phrzby Phil
Senior Member
Joined: 31 Oct 2006 Posts: 1050 Location: Richmond, Virginia
|
|
|
|
Would you write this new JCL to the override library of an existing scheduled (dummy) member? |
|
Back to top |
|
|
mpkmr
New User
Joined: 15 Apr 2008 Posts: 9 Location: bangalore
|
|
|
|
Hi
i have submitted one job in control-m.but the job abended with not submit.when i checked the log it show no job card.but i checked in the jcl the job card was there.if u guys have the answer for my question it willhelpful for me. |
|
Back to top |
|
|
Anuj Dhawan
Superior Member
Joined: 22 Apr 2006 Posts: 6248 Location: Mumbai, India
|
|
|
|
Looking at the JCL generated & the error messages (SYSOUT) might provide us some insight to suggest something useful... |
|
Back to top |
|
|
mpkmr
New User
Joined: 15 Apr 2008 Posts: 9 Location: bangalore
|
|
|
|
Thanks for ur reply.that jcl not yet executed.i saw the log of control-m.there we can see only the log of job how was submitted & what was the error.only error message i saw it was no job card & job not submitted.can any help me out |
|
Back to top |
|
|
gcicchet
Senior Member
Joined: 28 Jul 2006 Posts: 1702 Location: Australia
|
|
|
|
Hi,
have you tried submitting the job outside of Control-M ?
If not, try it and see if you get the same error.
By the way the job did not abend, Control-M was unable to sumbit the job due to invalid job card.
Gerry |
|
Back to top |
|
|
|