TRac32
New User
Joined: 02 May 2022 Posts: 1 Location: United States
|
|
|
|
I have a single job with two schedule ID’s. One runs the job the last day of the month and the other schid runs the last Sunday of the month. The problem I’m trying to correct arises when the last day of the month falls on a Sunday which causes a conflict between the two schedules.
My first thought was to split the two schids into two separate job names, while making one job a requirement for the other so they can’t run at the same time. The problem is this scenario would only apply on the rare days they both run and on all other days the requirement wouldn’t be met.
I’m not extremely familiar with ca7 so thought I’d look for some input. Can a schid be created with a conditional statement? |
|
Back to top |
|
 |
Rohit Umarjikar
Global Moderator

Joined: 21 Sep 2010 Posts: 3077 Location: NYC,USA
|
|
|
|
Welcome! Please search or ask at your site for Negative dependency in scheduling. |
|