Balu5491
New User
Joined: 01 Aug 2016 Posts: 14 Location: India
|
|
|
|
I have a job suit, say
Job1
Job2
Job3
Job4
I want to run this job suit for every 2 hours, I could able to link the job Job1->Job2->job3->job4.
Now i want to make sure if any of the job fails, then the suit should not start for the next cycle(as it is scheduled to run for every 2 hours).
I do not know all the options available in Control-M. I am aware that there is CAN-RUN STAT condition can be added but i do not have full understanding on this topic, If i get some doc/link, it will be useful for me.
Thanks.
Balu. R, |
|
Robert Sample
Global Moderator
Joined: 06 Jun 2008 Posts: 8700 Location: Dubuque, Iowa, USA
|
|
|
|
Google is your friend. Googling control-m user guide returns about 870,000,000 results and several on the first page are BMC manual links. |
|