|
View previous topic :: View next topic
|
| Author |
Message |
abraralum
New User
Joined: 19 Dec 2010 Posts: 42 Location: Bangalore
|
|
|
|
Hi All,
Is it possible to extract the Predecessors/Successors/Special resources of a application in OPC through a JCL to a file?
Manually checking the Applications in OPC for above is time consuming when validation is required for several applications.
Please refer me to any link/reference from which I can get some pointers to get started. |
|
| Back to top |
|
 |
PeterHolland
Global Moderator

Joined: 27 Oct 2009 Posts: 2481 Location: Netherlands, Amstelveen
|
|
|
|
IBM Tivoli Workload Scheduler for z/OS
Managing the Workload
Appendix C |
|
| Back to top |
|
 |
David Robinson
Active User
Joined: 21 Dec 2011 Posts: 199 Location: UK
|
|
|
|
| Option 1.4.4 should provide all of what you need. |
|
| Back to top |
|
 |
|
|