|
View previous topic :: View next topic
|
| Author |
Message |
krithikaj
New User
Joined: 10 Aug 2008 Posts: 45 Location: India
|
|
|
|
Hi
I have DB2 V9 CM on my test Sysplex and DB2 V8 CM on Production Sysplex.
I would like to know if there will be any conflict if I roll-out Programs (CICS-Cobol-DB2) to Production as DB2 versions are different on test and Production sysplexes
Thanks
K J |
|
| Back to top |
|
 |
dbzTHEdinosauer
Global Moderator

Joined: 20 Oct 2006 Posts: 6965 Location: porcelain throne
|
|
|
|
since you will have to bind them on the production system,
i think that if you have sql for 9 that does not work for 8,
the bind will tell you. but that is just a guess. |
|
| Back to top |
|
 |
Bill Woodger
Moderator Emeritus
Joined: 09 Mar 2011 Posts: 7309 Location: Inside the Matrix
|
|
|
|
Have you looked through the front of the DB2 V9 manuals to see what it says is changed in the release?
Can't help thinking you have to test it on V8 before going into production. If you don't, make sure you have some really important person to sign the release form, and that they are aware of this little situation. CYA.
If you are using anything non-vanilla, maybe post it here, someone might know a specific answer.
Good luck, I hope you don't need it... |
|
| Back to top |
|
 |
krithikaj
New User
Joined: 10 Aug 2008 Posts: 45 Location: India
|
|
| Back to top |
|
 |
Bill Woodger
Moderator Emeritus
Joined: 09 Mar 2011 Posts: 7309 Location: Inside the Matrix
|
|
|
|
You had a glitch in your URL encoding. Fixed in the above quote, in a rather cumbersome way to preserve the original look. |
|
| Back to top |
|
 |
|
|