View previous topic :: View next topic
|
Author |
Message |
krbabu
New User
Joined: 20 Feb 2004 Posts: 57
|
|
|
|
HI,
I have the job with 10 steps. I have coded the last 5 steps in a single proc.
My doubt is i want to start with the job from 6 step from 10 steps. Can V restart the job with proc or not? |
|
Back to top |
|
|
bluebird
Active User
Joined: 03 Feb 2004 Posts: 127
|
|
|
|
the parameter RETART= applies in your situation, and as far as I can recall, it does work for proc (at least for the restart from side of this, I'm not sure about being able to run only a subset of JCL steps from a proc.) |
|
Back to top |
|
|
bluebird
Active User
Joined: 03 Feb 2004 Posts: 127
|
|
|
|
can u plz check on manuals on this site... this is a standard restart coding. |
|
Back to top |
|
|
|