|
View previous topic :: View next topic
|
| Author |
Message |
Shaikshavali Warnings : 1 New User
Joined: 18 Jun 2005 Posts: 22 Location: chennai
|
|
|
|
| IN JCL,WE HAVE A STEP WITH TIME=2,AND JOB CARD CONTAIN TIME=3 WITH THIS WHT HAPPENED WHEN WE RUN THIS JCL |
|
| Back to top |
|
 |
Shaikshavali Warnings : 1 New User
Joined: 18 Jun 2005 Posts: 22 Location: chennai
|
|
|
|
| IN ENDEVOR WE WANT TO RETRIEVE AN ELEMENT BUT IT IS ALREADY THERE IN ENDEVOR AMD IS ACCESSED BY OTHER USER THEN WHT WE HAVE TO DO |
|
| Back to top |
|
 |
pnk079
New User

Joined: 28 Jun 2005 Posts: 5 Location: Mysore, Karnataka, India
|
|
|
|
| Shaikshavali wrote: |
| IN JCL,WE HAVE A STEP WITH TIME=2,AND JOB CARD CONTAIN TIME=3 WITH THIS WHT HAPPENED WHEN WE RUN THIS JCL |
The TIME LIMIT specified in JOBCARD will override the one specified for the step in JCL. And the job will run to good EOJ, if the TIME doesnt exceed 3. |
|
| Back to top |
|
 |
pnk079
New User

Joined: 28 Jun 2005 Posts: 5 Location: Mysore, Karnataka, India
|
|
|
|
| Shaikshavali wrote: |
| IN ENDEVOR WE WANT TO RETRIEVE AN ELEMENT BUT IT IS ALREADY THERE IN ENDEVOR AMD IS ACCESSED BY OTHER USER THEN WHT WE HAVE TO DO |
ENDEVOR is for version control and only 1 person at a time can have control over that member. If you need to modify that member, you need to co-ordinate with that person, to get the member SIGNED-IN. Then RETREIVE the same. |
|
| Back to top |
|
 |
priyesh.agrawal
Senior Member

Joined: 28 Mar 2005 Posts: 1448 Location: Chicago, IL
|
|
| Back to top |
|
 |
|
|