|
View previous topic :: View next topic
|
| Author |
Message |
umakanth.ravirala
New User
Joined: 04 Sep 2007 Posts: 15 Location: Halifax, United Kingdom
|
|
|
|
Hi, I need to hold the complete batch cycle after 10th job which has 101 successors in OPCA. If any one faced this situation, please help me out.
Thanks in advance |
|
| Back to top |
|
 |
titan
New User
Joined: 23 Jul 2006 Posts: 3
|
|
|
|
You can put manual hold on the 10th job first, then release the batch, after the 9 jobs complete, do adhoc run the 10th job.
When you want to continue the rest of batch, you only need to set the 10th job to NOOP.  |
|
| Back to top |
|
 |
expat
Global Moderator

Joined: 14 Mar 2007 Posts: 8798 Location: Welsh Wales
|
|
|
|
umakanth.ravirala
Since when was OPC (TWS) a CA product ??? |
|
| Back to top |
|
 |
|
|