|
View previous topic :: View next topic
|
| Author |
Message |
padma_prakasam
New User
Joined: 06 Oct 2005 Posts: 31
|
|
|
|
Hi,
In a Job i am creating a GDG generation in step1.How should i code if i want to refer that generation it in my future steps whether (+1) or with (0)??
Thanks
Padma |
|
| Back to top |
|
 |
superk
Global Moderator

Joined: 26 Apr 2004 Posts: 4652 Location: Raleigh, NC, USA
|
|
|
|
(+1).
Think about it a little and you'll realize why.  |
|
| Back to top |
|
 |
|
|