View previous topic :: View next topic
|
Author |
Message |
raviprasath_kp Warnings : 1 New User
Joined: 20 Feb 2005 Posts: 65 Location: chennai
|
|
|
|
any body can explanin me breifely what is the diff between
diff between -911 and -913
i know -911-dead lock-updates rolled back
-913-dead lock-updates not rolled back
anybody can give some real time situation for this
thanks in advance |
|
Back to top |
|
|
rsm_deepak
New User
Joined: 06 Apr 2005 Posts: 30 Location: visakhapatnam
|
|
|
|
-911 THE CURRENT UNIT OF WORK HAS BEEN ROLLED BACK DUE TO DEADLOCK OR TIMEOUT.
Explanation: The current unit of work was the victim in a deadlock, or experienced a timeout, and had to be rolled back.
-913 UNSUCCESSFUL EXECUTION CAUSED BY DEADLOCK OR TIMEOUT.
Explanation: The application was the victim in a deadlock or experienced a timeout. Here generally, the application should terminate. |
|
Back to top |
|
|
raviprasath_kp Warnings : 1 New User
Joined: 20 Feb 2005 Posts: 65 Location: chennai
|
|
|
|
thanks for your info
already i know that one,but i want to know some real time example
what type of situation -911 happend and when -913 happen |
|
Back to top |
|
|
dick scherrer
Moderator Emeritus
Joined: 23 Nov 2006 Posts: 19244 Location: Inside the Matrix
|
|
|
|
Hello,
Hopefully, you will not get many "real time" examples. . .
Most deadlocks are the result of poor process flow design. |
|
Back to top |
|
|
|