View previous topic :: View next topic
|
Author |
Message |
thesumitk
Active User
Joined: 24 May 2013 Posts: 156 Location: INDIA
|
|
|
|
Hi All,
I have a Requirement like below
I have a job A and its 3 requirement jobs say B,C,D
Now Suppose the job A got triggered at 11:00 Am and waiting for all those 3 requirements and at certain time it got the requirement satisfied and job A completed fine.
I have to check which was the job among B,C,D which completed in last and make Job A run.
Is it possible thru a command?.. I can do an analysis on SAR data and can achieve what I need but if I need to check it thru CA7 then do we have any advanced way or command to do it?
Please let me know if I am not clear above.. Thanks
Regards
Sumit |
|
Back to top |
|
|
vasanthz
Global Moderator
Joined: 28 Aug 2007 Posts: 1742 Location: Tirupur, India
|
|
|
|
Hello,
Would the LJOB command suffice?
It gives the last run date & time of a particular job.
Code: |
LJOB,JOB=XXXXXXXX
JOB=XXXXXXXX DATE=14.268 PAGE 0001
JOB ----JCL---- SYSTEM USR MAIN PROSE SCHED --NUMBER OF- LAST-RUN
NAME ID MEMBER -NAME- -ID -ID- DSNBR DSNBR STP DDS RUNS DATE/TIME
XXXXXXXX 143 XXXXXXXX YYYY 255 ALL *NONE* *NONE* 002 020 4013 14268/0016 |
|
|
Back to top |
|
|
|