View previous topic :: View next topic
|
Author |
Message |
alluri12
New User
Joined: 15 Aug 2006 Posts: 44 Location: Virginia, USA
|
|
|
|
Hi,
I need help in generating "LOAD REPLACE" syspunch in IBM unload. I tried to run unload job and every time it is creating "LOAD RESUME" control card. Could somebody help me on this. |
|
Back to top |
|
|
dbzTHEdinosauer
Global Moderator
Joined: 20 Oct 2006 Posts: 6966 Location: porcelain throne
|
|
|
|
well, i did not bother to check the manual to determine how it can be done,
maybe you can,
but i have always edited and changed the control card,
since i assumed (perchance incorrectly)
that the control card is always generated as LOAD RESUME |
|
Back to top |
|
|
Craq Giegerich
Senior Member
Joined: 19 May 2007 Posts: 1512 Location: Virginia, USA
|
|
|
|
dbzTHEdinosauer wrote: |
but i have always edited and changed the control card,
|
You mean manually change the control card? |
|
Back to top |
|
|
sureshpathi10
Active User
Joined: 03 May 2010 Posts: 154 Location: Kuala Lumpur
|
|
|
|
Yes Mr. Craq,
We have to manually edit the control card if you need. We all do. |
|
Back to top |
|
|
Bill Woodger
Moderator Emeritus
Joined: 09 Mar 2011 Posts: 7309 Location: Inside the Matrix
|
|
|
|
I think it was irony. |
|
Back to top |
|
|
|