View previous topic :: View next topic
|
Author |
Message |
gileshpg
New User
Joined: 22 May 2008 Posts: 27 Location: Bangaluru
|
|
|
|
Hello all,
Is there a Control-M utility that would allow me to find out what
jobs will run on a specific day? Is it possible to get the list using a batch job?
Regards |
|
Back to top |
|
|
expat
Global Moderator
Joined: 14 Mar 2007 Posts: 8797 Location: Welsh Wales
|
|
|
|
Almost certainly.
What did it say in the product manuals regarding this
I will also take this opportunity to point out that Control-M IS NOT an IBM product, and have thus moved the post. |
|
Back to top |
|
|
Ed Goodman
Active Member
Joined: 08 Jun 2011 Posts: 556 Location: USA
|
|
|
|
They call it CTMRPFL (I think it's short for Control-M report flow).
You'll need to figure out where your 'newday' job is running, and what it's looking at. The newday job run every day as part of Control-M, and it reads all of the listed schedules, checks their calendar settings, and adds the jobs needed to the active jobs file.
This CTMRPFL utility simulates the first part and will list out the jobs to run in a given date range.
BMC rearranged the manuals, so you probably should just do a search in the PDF directory for that name. It's actually a procedure, and it's delivered in someHLQ.INST.PROCLIB. |
|
Back to top |
|
|
|