adeshkapil
New User
Joined: 19 Mar 2009 Posts: 1 Location: Gurgaon
|
|
|
|
Hi All,
We have a Connect Direct job from MVS node to a AS 400 (i series) node (-Destinaton node has been changed to point to new destination).
We have a Run task command in STEP02 after Copy command in STEP01.
The Run task command is used to update the OPC job status using USRA.
The run task is coded to run on PNODE.
When submitting the job transfer gets completed successfully, but the run task command gets executed on the destination node.
The same code is running in Live (with old node name, not on i series system), and the Run task gets executed on source side.
The run task should be executed on source node.. |
|