View previous topic :: View next topic
|
Author |
Message |
hyuzen
New User
Joined: 10 Jul 2005 Posts: 58
|
|
|
|
Hi,
I sometimes meet an allocation failure of a pds on the share volume from prod system while I am transfering a member of pds in the Test system to Prod system. When I check allocation of pds logining the Test system using a mvs command (d grs,res=(*,test.batch.load) ) but I did not see any allocation on it.
All I can do is after renaming that pds in the TEST system, create same one and copy all members into it...
Thanks in advance,
Huseyin
* Sorry for resubmiting same question but did not get any response. |
|
Back to top |
|
|
MGIndaco
Active User
Joined: 10 Mar 2005 Posts: 432 Location: Milan, Italy
|
|
|
|
Can this problem occur for a non shared volume between the two systems? (Test-Prod)
Usually, in my experience, I found useful divide test volume from prod volume for different reason(the most comprensible is the privacy) so, I think that if you call your storage admin you will find all the anser you are looking for.
I hope in this suggest. |
|
Back to top |
|
|
hyuzen
New User
Joined: 10 Jul 2005 Posts: 58
|
|
|
|
Hi MGIndaco
Thank you for your response.
The problem takes place for shared volume between Test & Prod systems. Prod system loses dir-info of test.batch.load...
Regards,
hyuzen |
|
Back to top |
|
|
MGIndaco
Active User
Joined: 10 Mar 2005 Posts: 432 Location: Milan, Italy
|
|
|
|
Excuse me but sometime I can't understand...
What do you mean with:
Quote: |
Prod system loses dir-info of test.batch.load |
I've a doubt... cordially try to use other words...
Thanks in advance. |
|
Back to top |
|
|
hyuzen
New User
Joined: 10 Jul 2005 Posts: 58
|
|
|
|
hi MGIndaco
test.batch.load is a pds located on the share volume. when I try to access test.batch.load from Prod system, I am not able to see even directory information of it. On the other hand, I can access same pds from Test system.
thanks in advance,
hyuzen |
|
Back to top |
|
|
radhakrishnan82
Active User
Joined: 31 Mar 2005 Posts: 435 Location: chennai, India
|
|
|
|
hyuzen,
I had this problem.I used to copy the member into a temorary file(which exists only for 7 days) and then transfer easily from test to prod region.Then in prod region,i copy this temp file to other neccessary datasets.
I can access the dastaset in test as well as prod but i couldnt trnasfer it.
Still,iam using such way to transfer.I thought that its access kind of problem whil transferring. |
|
Back to top |
|
|
|