Hi All,
i have a job abended in the CA7 list, is it possible to cancel/purge that job in Spool out side the regular CA7 screen
thanks
girish |
|
Back to top |
|
|
dick scherrer
Moderator Emeritus
Joined: 23 Nov 2006 Posts: 19244 Location: Inside the Matrix
|
|
|
|
Hello,
Suggest you talk with your scheduling people. I am not sure what you are asking. . .
Many jobs are run other than thru CA-7, so i'm not sure where these would fit into the question.
Your scheduling people should be able to explain how things are handled on your system. |
|
Back to top |
|
|
aripallig
New User
Joined: 05 Jul 2005 Posts: 23 Location: india
|
|
|
|
Hello,
thanks for the reply, i am trying to ask that if a job is running normally in CA7 we have option to cancel or force complete the job in CA7 itself.
As the job which abends will be present in Spool, this abended job which is defined in CA7 can be cancelled for purged in normal Spool.
thanks,
Girish |
|
Back to top |
|
|
expat
Global Moderator
Joined: 14 Mar 2007 Posts: 8797 Location: Welsh Wales
|
|
|
|
What are you trying to hide |
|
Back to top |
|
|
vasanthz
Global Moderator
Joined: 28 Aug 2007 Posts: 1742 Location: Tirupur, India
|
|
|
|
In our shop, on SDSF putting a 'P' before a user prefix(non production) job purges the job from Spool.
'C' to cancel.
Maybe shop specific too, not sure, try it out. |
|