View previous topic :: View next topic
|
Author |
Message |
Debasis Misra Warnings : 1 New User
Joined: 16 Sep 2008 Posts: 72 Location: Bangalore
|
|
|
|
The Schenario is like :
--------------------------
5 jobs are scheduled in the spool in HOLD status by giving the option TYPRUN = HOLD.
We have to activate the job one by one. Each job is dependents on the previous job (2nd job shold run after 1 st job, 3rd job should run after 2 nd job, so on).
Can any one help me out how to implement this in REXX? |
|
Back to top |
|
|
expat
Global Moderator
Joined: 14 Mar 2007 Posts: 8797 Location: Welsh Wales
|
|
|
|
The original topic was locked and moved to off topics.
DO NOT POST IT AGAIN
If you can not keep track of the topics that you have started, do not expect anyone else to do it for you. |
|
Back to top |
|
|
|