View previous topic :: View next topic
|
Author |
Message |
abdulrafi
Active User
Joined: 14 Sep 2009 Posts: 184 Location: Coimbatore
|
|
|
|
Hi! Can i know how IMSDC screens are scheduled from the driver program. Is there a part played by the DBA while the online screens are scheduled from the driver program and then scheduling for the other online programs.
Also can i know how do we link the MFS and the screen program. Is there any jcl to do this. if so can you please provide me. |
|
Back to top |
|
|
Sandy Zimmer
Active Member
Joined: 13 Jun 2007 Posts: 826 Location: Wilmington, DE
|
|
|
|
I have posted this process several times. I have included links which shows the flow......did you search the forum? The latest were posted within the past couple of weeks. |
|
Back to top |
|
|
abdulrafi
Active User
Joined: 14 Sep 2009 Posts: 184 Location: Coimbatore
|
|
|
|
Hi,
I am unable to get the linking between the MFS and online programs. I think it should be done with the help of a jcl.
If possible kindly send me the details. |
|
Back to top |
|
|
Sandy Zimmer
Active Member
Joined: 13 Jun 2007 Posts: 826 Location: Wilmington, DE
|
|
|
|
No - it is NOT done thru JCL. There is no JCL in IMS DC/MFS transaction
processing. You should do some research about DC transactions. Also, check out the format for MFS. |
|
Back to top |
|
|
abdulrafi
Active User
Joined: 14 Sep 2009 Posts: 184 Location: Coimbatore
|
|
|
|
Do you have any idea on BTS. |
|
Back to top |
|
|
Sandy Zimmer
Active Member
Joined: 13 Jun 2007 Posts: 826 Location: Wilmington, DE
|
|
|
|
BTS is a testing tool. It is done AFTER the transaction - program - MFS are completed. It has no relevance to the question asked. |
|
Back to top |
|
|
|