View previous topic :: View next topic
|
Author |
Message |
shr_amar Warnings : 2 Active User
Joined: 02 May 2005 Posts: 128 Location: UK
|
|
|
|
well i haven't written any code . But i have tried to connect REXX- SDSF
using isfcalls as per prino and Manual example . It seems that this routine is not found . |
|
Back to top |
|
|
expat
Global Moderator
Joined: 14 Mar 2007 Posts: 8797 Location: Welsh Wales
|
|
|
|
shr_amar wrote: |
I do not want to modify jobs to include extra steps. It should be like that when we SUB the job we enter SUB TSO XDC . So that REXX will be activated to take XDC of the o/p. |
expat wrote: |
Then it looks like either you change the jobs to add a final step, or continue to do it manually. |
Explain to me the process of this super command that will wait until a batch job has finished and then know that it is time to perform SDSF or XDC actions. |
|
Back to top |
|
|
|