View previous topic :: View next topic
|
Author |
Message |
divate.dilip
New User
Joined: 11 May 2009 Posts: 15 Location: Mumbai
|
|
|
|
HI I am getting this abend in IMS, as the IMS program gets created temp I dont know how to solve the issue.
Below is the message I get when the job abends.Could any one help me regarding this.
CAPD112W SYMBOLIC INFORMATION NOT FOUND FOR PROGRAM "DFSPCC20".
LOAD LIBRARY: IMSESA.IMT1DBC.RESLIB
MODULE LENGTH: 000014A8 (DECIMAL 5,288)
LINK OPTIONS: AC(0), AMODE(31), NOOVLY, RENT, REUS, RMODE(24)
ABENDING INSTRUCTION
0A0D SVC SUPERVISOR CALL
INTERRUPT OCCURRED AT ADDRESS 800097C2 AT OFFSET +000C6A IN PROGRAM DFSPCC20
************************
* MODULE CALL SEQUENCE *
************************
LOAD PROGRAM PROGRAM ENTRY
MODULE PROGRAM/PROCEDURE ADDRESS LENGTH ADDRESS
-------- ------------------------------ -------- ------ --------
SYSTEM 00000000 000000 00000000
CALLED DFSRRC00 DFSRRC00 00007E10 0000FC 00000000
CALLED DFSRRC40 DFSRRC40 00025CF0 000220 00000000
CALLED DFSPCC20 DFSPCC20 00008B58 0013B8 00000000
CALLED DFSPCC20 DFSPCC20 00008B58 0013B8 00000000
(ABENDED) |
|
Back to top |
|
|
enrico-sorichetti
Superior Member
Joined: 14 Mar 2007 Posts: 10873 Location: italy
|
|
Back to top |
|
|
dick scherrer
Moderator Emeritus
Joined: 23 Nov 2006 Posts: 19244 Location: Inside the Matrix
|
|
|
|
Hello,
Quote: |
I have not understood, what is difference between using prod and test library. |
Suggest you speak with your manager, some senior, or your dba.
One of the most basic controls is that Production jobs are run from Production libraries. Developers should not modify Production libraries (or data for that matter) "on the fly".
Developers should run their tests using the test libraries for their code to be tested and possibly read production libraries to execute already existing production modules.
How production and test libraries as well as production/test files and databases are managed/controlled should be learned from those people i mentioned above. |
|
Back to top |
|
|
Anuj Dhawan
Superior Member
Joined: 22 Apr 2006 Posts: 6250 Location: Mumbai, India
|
|
|
|
A very trivial solution which comes to mind, with the information in hand, check if you've spelled the PSB-name correctly -- PSB name is third positional operand of the PARM field on the EXEC control statement. |
|
Back to top |
|
|
|