priyesh.agrawal
Senior Member
Joined: 28 Mar 2005 Posts: 1448 Location: Chicago, IL
|
|
|
|
Hi richie,
Quote: |
what does REGION=0M indicates in JOB statement |
means to allocate all available region to the concerned Job or step.
Quote: |
whether TIME=1440 and no time parameter coded on Job statement means the same? |
TIME=1440 means 1440 minutes specification for the job. & I think its the max U can specify.
No time parm coding means It'll take by default time specified for that perticular CLASS (Installation Specified.)
Corrections are wel come.
Regards,
Priyesh. |
|