Hi, I need to hold the complete batch cycle after 10th job which has 101 successors in OPCA. If any one faced this situation, please help me out.
Thanks in advance |
|
Back to top |
|
|
titan
New User
Joined: 23 Jul 2006 Posts: 3
|
|
|
|
You can put manual hold on the 10th job first, then release the batch, after the 9 jobs complete, do adhoc run the 10th job.
When you want to continue the rest of batch, you only need to set the 10th job to NOOP. |
|
Back to top |
|
|
expat
Global Moderator
Joined: 14 Mar 2007 Posts: 8797 Location: Welsh Wales
|
|
|
|
umakanth.ravirala
Since when was OPC (TWS) a CA product ??? |
|