Hi,
I have a job with step which returns completion code as non zero (ex: 1 ) and the job status in the SAR/spool also shows the STAUS of job as non zero (ex:0001).
But we need JOB status in SAR/spool as space even though the step in the job ends with completion code as non zero(ex:1).
Please let me know if any one knows the solution for this.
Thanks,
Pushpa |
|
Back to top |
|
|
expat
Global Moderator
Joined: 14 Mar 2007 Posts: 8797 Location: Welsh Wales
|
|
|
|
Quote: |
But we need JOB status in SAR/spool as space even though the step in the job ends with completion code as non zero(ex:1). |
NEED ? what a strange business requirement.
You need to talk to the people that perform your SAR installation and customisation workload. |
|
Back to top |
|
|
dick scherrer
Moderator Emeritus
Joined: 23 Nov 2006 Posts: 19244 Location: Inside the Matrix
|
|
|
|
Hello,
Quote: |
But we need JOB status in SAR/spool as space even though the step in the job ends with completion code as non zero
|
I believe you have not posted what you need - you have posted how you want to meet your need. If you post what you are really trying to accomplish, someone may have a suggestion.
Quote: |
Please let me know if any one knows the solution for this |
Once something is "done" the condition code is not to be changed. That is a terrible idea even if you find a way. . . How would anyone ever know they were looking at what really went on in a job if it could be changed after execution? |
|
Back to top |
|
|
Craq Giegerich
Senior Member
Joined: 19 May 2007 Posts: 1512 Location: Virginia, USA
|
|
|
|
dick scherrer wrote: |
That is a terrible idea even if you find a way. . . How would anyone ever know they were looking at what really went on in a job if it could be changed after execution? |
That may very well be the idea! |
|