hi
for how lang a job can be executed continously in a mainframes?
regards
naveen |
|
Back to top |
|
|
subhasis_50
Moderator
Joined: 09 Mar 2005 Posts: 363 Location: Earth
|
|
|
|
Hi,
The maxm limit in mainframe is 248 days for a particular job. |
|
Back to top |
|
|
MGIndaco
Active User
Joined: 10 Mar 2005 Posts: 432 Location: Milan, Italy
|
|
|
|
Depend on your personal setting, on the time you specify within the job or that is specified in your system scheduler as OPC(i.e TIME parameter in JCL, or DeadTime in OPC) |
|
Back to top |
|
|
priyesh.agrawal
Senior Member
Joined: 28 Mar 2005 Posts: 1448 Location: Chicago, IL
|
|
|
|
If you specifies TIME=MAXIMUM. It can run for 357912 Minutes. which is bit more than 248 days.
Regards,
Priyesh. |
|
Back to top |
|
|
Prandip
New User
Joined: 04 Mar 2005 Posts: 84 Location: In my tiny cubicle ...
|
|
Back to top |
|
|
vishal_a
New User
Joined: 24 May 2005 Posts: 45 Location: Noida
|
|
|
|
hi
the max time limit is 248.55 days |
|
Back to top |
|
|
mmwife
Super Moderator
Joined: 30 May 2003 Posts: 1592
|
|
|
|
The manual also says that TIME=1440 OR TIME=NOLIMIT will allow unlimited execution. It also says that a limit can be set thru SMF and if that limit is reached the step enters a wait state until the pgmr specified time limit is reached. at such point the step is abnormally terminated.
The short ans is READ THE MANUAL. |
|