balu reddy
New User
Joined: 09 Feb 2007 Posts: 5 Location: hyd
|
|
|
|
Code: |
//WB120020 EXEC UCC7TRLR,COND=(0,LT,WB120010.WB120020)
//SYSIN DD *
/LOGON MELLON,BANK
DEMAND,JOB=WB120FTP
/LOGOFF
/*
// |
can anybody explain me what actually done in the above PROC. Is there any parameter like DEMAND in JCL can any body let me in detail.....
Regards,
Balu. |
|
superk
Global Moderator
Joined: 26 Apr 2004 Posts: 4652 Location: Raleigh, NC, USA
|
|
|
|
From what I can tell, UCC7TRLR is an interface into the CA-7 Workload Automation system, and the DEMAND parameter allows you to "demand" in (i.e. trigger) the specified job. |
|