View previous topic :: View next topic
|
Author |
Message |
mull
New User
Joined: 21 Sep 2006 Posts: 15 Location: india
|
|
|
|
Hi All,
If step 1 in my job is creating a (+1) version of a gdg and it is accessed in step 2.if step 2 fails and i restart it from step 2 what change will i have to make in the version number. |
|
Back to top |
|
|
priyesh.agrawal
Senior Member
Joined: 28 Mar 2005 Posts: 1448 Location: Chicago, IL
|
|
|
|
(+0) instead of (+1). |
|
Back to top |
|
|
iknow
Active User
Joined: 22 Aug 2005 Posts: 411 Location: Colarado, US
|
|
|
|
Hi Priyesh,
Just clarify one thing.
1) If we are testing our job then it is fine changing (+1) to (0) version.
2)What happens if we are asking the operator to restart the job from STEP2 and if the operator does the EQQCLEAN. If STEP2 uses the (+0) version then it will pick the data from the previous version and not newly created version from STEP1.
So I believe it has to (+1) version when the job to be restarted from STEP2.
Please correct me if I am wrong. |
|
Back to top |
|
|
priyesh.agrawal
Senior Member
Joined: 28 Mar 2005 Posts: 1448 Location: Chicago, IL
|
|
|
|
Quote: |
and if the operator does the EQQCLEAN. |
What is EQQCLEAN. |
|
Back to top |
|
|
|