hi,
I have a job trigerred by another job. I would like to schedule the trigerred Job. is it possible in CA-7 to schedule this when a particular step in the trigerring JCL is completed.
thanks in advance. |
|
Back to top |
|
|
manisam
New User
Joined: 24 Sep 2006 Posts: 3 Location: Chennai..India
|
|
|
|
U mean u want to schedule the Triggering job from the particular step..
If it is so.. then
U can override the Jcl in the local PDS..deleting or commenting the steps u dont want..
Then U can Demand in the Job from the Local PDS with Triggers..
Hope this helps u in some way..
If any thing better can be done....buddies out thr kindly provide ur ideas... |
|