Hi,
I have one job which will create a GDG DATASET(+1).It usually runs at 4.00AM and there is another job which is using same GDG DATASET(+0) at 3.55AM.Some times this job will run for a long time and first job which creates this (+1) version will be on hold till the second job finishes. Eventhough(+0) version is in SHR mode I am confused how it is affecting the creation of (+1) version. Could any one please give me any solutions or alternatives for this?
Thanks |
|
Back to top |
|
|
superk
Global Moderator
Joined: 26 Apr 2004 Posts: 4652 Location: Raleigh, NC, USA
|
|
Back to top |
|
|
MainframeHelp4_u
New User
Joined: 15 Aug 2006 Posts: 25
|
|
|
|
Make sure that First Job & Second Job should have proper PRED & SUCCesor as per your requiremtn.. Hold the one Job by changing the existing Schedule in OPAC(Operations Planning And Control)
cheers
Sri |
|